The better solution already exists. Most buildings just haven't been shown the evidence.

Traditional buildings heat water in a single plant room and push it through the entire building. Fala puts a small electric unit at every fixture eliminating the pipe run, the plant room, and everything that goes wrong in between.

Who is Fala

Fala is a Bromic Group company built to lead the transition to all-electric, point-of-use hot water for commercial and multi-residential buildings across Australia.

What We Make?

Fala is a Bromic Group company built to lead the transition to all-electric, point-of-use hot water for commercial and multi-residential buildings across Australia.

Fala is a Bromic Group company built to lead the transition to all-electric, point-of-use hot water for commercial and multi-residential buildings across Australia.

Fala is a Bromic Group company built to lead the transition to all-electric, point-of-use hot water for commercial and multi-residential buildings across Australia.

All-electric. All point-of-use.

Fala makes instantaneous, storage and boiling water units designed for commercial and multi-residential buildings. All-electric — no gas, no heat pumps, no centralised plant.

The complete range.

18kW / 27kW
50°C limited
3 Phase Instantaneous Hot Water

The specification hero. Engineered for multi-residential towers, aged care, and large commercial applications where centralised systems have been the default.

18kW / 27kW
50°C limited
Small Tank Hot Water

The specification hero. Engineered for multi-residential towers, aged care, and large commercial applications where centralised systems have been the default.

18kW / 27kW
50°C limited
Boiling Water Dispensers

The specification hero. Engineered for multi-residential towers, aged care, and large commercial applications where centralised systems have been the default.

The Data Doesn't Lie.

Point-of-use electric hot water for commercial and multi-residential buildings. Less complexity, less waste.

System Efficiency
97%
Point-of-use electric

vs. 65% for centralised systems once distribution losses are factored in.

Efficiency Gain
45%
When circulation is eliminated

The pipe run isn’t just inconvenient — it’s where the energy goes.

Plant Room Required
Zero
Plant room on your floor plan.

No shared infrastructure. No dedicated plant. Just floor area in the building.

Failure Risk
1 → 1
Contained per unit
One failure affects one apartment. Not the entire building.

Case studies

Aged Care • Brisbane, QLD
Greenside Aged Care - 128 showers
$193k
CapEx saving
$193k
CapEx saving
$193k
CapEx saving
Aged Care • Brisbane, QLD
Greenside Aged Care - 128 showers
$193k
CapEx saving
$193k
CapEx saving
$193k
CapEx saving
Aged Care • Brisbane, QLD
Greenside Aged Care - 128 showers
$193k
CapEx saving
$193k
CapEx saving
$193k
CapEx saving

We're changing how buildings deliver hot water. Ready to see what that means for your next project?